Cathodic Protection of Two Storage Tanks

Implementation of Phase 1 of the cathodic protection system for two storage tanks of 4,000 m³ and 2,000 m³. The project includes external protection works. Phase 2, dedicated to the internal protection of the two tanks, is currently underway.

Related services